Outer wall clean


   The work high above the ground is cleans the difficulty which the company works, the risk is big, but at the same time also is the income considerable service project, a tall building, ruined by wind and rain, does not clean is not good, only then promptly completes the clean work to be able to avoid or the reduced outer wall surface damage. Therefore, we have the necessity to the work high above the ground, clean the outer wall or the glass curtain wall make the special introduction.

   Olymcn Co. specialized outer wall whitewashes, the room inside and outside whitewashes and so on, the high difficulty whitewashes the price generally in 5 Yuan - 20 Yuan, looks at the job location in the formulation plan and the project funds.
  
   First, the outer wall cleans way

  At present the outer wall clean mainly has two ways: The hanger plate way and scratches the window way.

  The hanger plate way is with the bridle, the hanger plate hangs the human to the working position carries on the clean. This kind of sound type quite simple, cost also low, so long as the worker physical quality good, the string connection reliable may carry on, the general building all may use this way to carry on the clean, but this way operation must enable the security measure to arrive, otherwise the risk very is big, creates the casualty all is because the security measure does not arrive creates.

  Second, the outer wall cleans condition

  1st, climatic conditions: The outer wall clean must have to carry on under the good climatic conditions, the wind power should be smaller than 4 levels, 4 levels of above knock offs. Therefore, before the work should determine the wind power, in particular upper air wind power. Moreover, rains, snows, has the fog, the visibility difference as well as the high temperature (35 ℃ above) and the low temperature (0 ℃ below) and so on under the condition all not suitablly carries on the outer wall clean.

  2. personnel conditions: In order to carry out the national security laws and regulations, guarantees the worker personal safety and the equipment normal work, stipulated: The upper air operator must is 18 year-old masculine citizen front, and after the health examination and security technology training, after the test qualified only then work, the worker posts does not have to drink wine, to have bodily ill symptom and so on the cold suspends the work high above the ground.

  3rd, equipment condition: The outer wall cleans the equipment must be at the good working mode active status, every hanger plate has is scared, the partial strands gradually cracks and so on the phenomenon should replace the new rope immediately.

  Third, rules for safe operation

  Does front l, go to work must earnestly inspect the mechanical device, the apparatus, the string, the seat board, whether there is the safety belt damages, guarantees the machine capability to be good and each kind of apparatus does not have the exceptionally present image space to be able to post the operation.

  2nd, operates the rope, the safety rope must separately take root and grip tightly is dies, depends on must add the pad along the mouth place to be soft, prevented because of wears but breaks the rope, the string lower extremity certainly must contact the ground, puts at the same time the rope person also to have to be the temporary safety rope.

  Front 3rd, the construction posts must put on the work clothes, wears the safety helmet, posts when must be the safety belt first, then is the insurance locks (on safety rope), in future will be again good unscrews (operates on rope), at the same time will sit the board knot to have to be important, will die firmly.

  When 4th, under rope, in the construction person in charge and the building the guardianship personnel wants to render the direction and the assistance. 

  5th, when operation assists the apparatus to have to grip tightly grips the jail. by to guard against falls offends somebody, at the same time strictly prohibits smiling creates a disturbance and carries other irrelevant goods;

  6th, in the building, the ground guardianship personnel must persevere in the job location. practically fulfills the responsibility. to observe operation phenomenon as necessary and so on rope, safety rope loose and tight and hemp, string rope, found the problem prompt report, promptly removes.

  7th, in the building the guardianship personnel does not have to pace up and down at will in the roof border. When need, must be the good own safety rope first, in future will carry on the auxiliary work again. The ground guardianship personnel does not have to read in the job location reads a newspaper, does not have to watch other scenes at will. And must stop the pedestrian to enter the hazardous location and the anchor rope as necessary, flings the rope phenomenon occurrence.

  8th, operates when the rope, the safety rope must shift, about, the guardianship personnel and the helper want together to coordinate places, does not use when must hit the string bunch of tight.

  9th, the construction must fall to the ground, must observe the ground, the wall facility first, operates the rope, the safety rope localization and pedestrian current capacity how many situations, waits the ground guardianship personnel to process, the adjustment, after agreed only then slowly drops, until ground.

  10th, must persist the safety first, the civilized construction, guarantees the project grade of service.

  11th, does not permit randomly to take the party of the first part or the customer goods, does not have to damage the party of the first part or customer each kind of facility.

  12th, the work high above the ground personnel and the scene guardianship personnel must obey the construction person in charge's unified command and unify the management.